E - Fixed Constructions – 21 – B
Patent
E - Fixed Constructions
21
B
262/6
E21B 41/04 (2006.01) E21B 41/02 (2006.01)
Patent
CA 1135731
ABSTRACT OF THE DISCLOSURE In mining a heavy coal seam that must be excavated in several benches, the excavation of the uppermost bench is accompanied by the introduction of a cementitious slurry into the resulting stope for consolidating the waste rock present therein, preparatorily to the excavation of the next-lower bench, and proceeding in like manner with the second bench if a third one is to follow. The cementitious slurry comprises burnt or slaked lime, and/or portland cement, suspended in water in a quantity of about 10 to 60 % by weight and preferably together with a small percentage of chlorides of one or more alkali or alkaline- -earth metals, to which ceramic aggregates of large specific surface such as mineral ashes, slag, sand or dolomite powder may be added in a quantity of up to about 30 % of the weight of the water. The slurry, on being admitted to the stope in an amount of at least 10 % of the volume thereof, causes the waste rock to swell and to form a solid layer of up to approximately a meter in thickness which allows the next-lower bench to be excavated after only about a month's delay.
354552
Barsi Karoly
Dorombozi Laszlo
Forisek Istvan
Kuburczik Gyula
Stuber Gyorgy
Swabey Ogilvy Renault
Tatabanyai Szenbanyak
LandOfFree
Method of mining heavy coal seams in two or more benches does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Method of mining heavy coal seams in two or more benches, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Method of mining heavy coal seams in two or more benches will most certainly appreciate the feedback.
Profile ID: LFCA-PAI-O-1128960