E - Fixed Constructions – 21 – B
Patent
E - Fixed Constructions
21
B
E21B 43/26 (2006.01) E21B 43/16 (2006.01) E21B 43/267 (2006.01)
Patent
CA 2602655
The invention relates to oil production stimulation methods and can be used for both reservoirs with fractures resulting from the fracturing procedure and reservoirs with naturally occurring fractures, for which the fracturing procedure is not mandatory. A material which expands while hardening or setting, is injected into the near-wellbore region of a cased well, into the space between the casing and the reservoir, and the wellbore is then perforated. A material having an expansion degree sufficient for application of pressure to the wellbore walls and for keeping at least one fracture open is used as the material which expands while hardening or setting. After the perforation has been done, the reservoir is hydraulically fractured. For naturally fractured reservoirs, the fracturing procedure is not mandatory.
Schlumberger Canada Limited
Smart & Biggar
LandOfFree
Well productivity enhancement method (options) does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Well productivity enhancement method (options), we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Well productivity enhancement method (options) will most certainly appreciate the feedback.
Profile ID: LFCA-PAI-O-1427323