E - Fixed Constructions – 21 – B
Patent
E - Fixed Constructions
21
B
E21B 43/16 (2006.01) E21B 43/243 (2006.01) E21B 43/30 (2006.01)
Patent
CA 2088179
F-6524 pwr -1- A METHOD FOR ENHANCED OIL RECOVERY TROUGH A HORIZONTAL PRODUCTION WELL IN A SUBSURFACE FORMATION BY IN-SITU COMBUSTION ABSTRACT A horizontal production well is located in the lower portion of a heavy viscous oil-bearing reservoir. A vertical injection well is located in the upper portion of the reservoir. Oxygen-enriched gas is injected down the injector well and ignited in the upper portion of the reservoir to create a combustion zone that reduces viscosity of oil in the reservoir as the combustion zone advances downwardly toward the horizontal production well, the reduced-viscosity oil draining into the horizontal production well under force of gravity.
Ostapovich Eugene
Pebdani Farrokh Nasseri
Kirby Eades Gale Baker
Mobil Oil Corporation
LandOfFree
Method for enhanced oil recovery through a horizontal... does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Method for enhanced oil recovery through a horizontal..., we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Method for enhanced oil recovery through a horizontal... will most certainly appreciate the feedback.
Profile ID: LFCA-PAI-O-1501092