A method for designing a closed-chamber drillstem test system. Parameters of available equipment and a well to be tested are collected. Initial or proposed chamber size and chamber pressurizing fluids are then selected. A simulation of a test is then performed. The simulation is performed in time increments, with pressure in the well assumed to be static during each time increment. Calculated flow volume from the formation during each increment is used to adjust pressure in the well for the next increment. The process is continued until the test would be considered complete based on an optimization parameter. If the total simulated time to complete the test is not in a desirable range, the initial chamber parameters are changed and the simulation is run again. The process is repeated until the simulated test time reaches a desirable range.
Halliburton Energy Services Inc.
Ogilvy Renault Llp/s.e.n.c.r.l.,s.r.l.
LandOfFree
Method for designing formation tester for a well does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Method for designing formation tester for a well, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Method for designing formation tester for a well will most certainly appreciate the feedback.
Profile ID: LFCA-PAI-O-1641232