E - Fixed Constructions – 21 – B
Patent
E - Fixed Constructions
21
B
E21B 43/00 (2006.01) E21B 33/14 (2006.01) E21B 43/02 (2006.01) E21B 43/04 (2006.01) E21B 43/116 (2006.01)
Patent
CA 2088292
Abstract of the Disclosure Methods of completing a well bore having a conduit disposed therein where portions of the well bore and conduit are positioned substantially horizontally in a subterranean producing formation are provided. A hardenable resin composition coated particulate solid material is placed in the annulus between the sides of the well bore and the conduit, and the resin composition is caused to harden whereby the particulate material is consolidated into a hard permeable mass. An aqueous cement slurry is introduced into the permeable consolidated particulate material whereby horizontal sections thereof are isolated which allows tests and/or treatments in selected portions of the horizontal well to be performed.
Haliburton Company
Swabey Ogilvy Renault
LandOfFree
Horizontal well completion methods does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Horizontal well completion methods, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Horizontal well completion methods will most certainly appreciate the feedback.
Profile ID: LFCA-PAI-O-2055645