A method for obtaining leak-off test and formation integrity...

E - Fixed Constructions – 21 – B

Patent

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

E21B 44/00 (2006.01) E21B 47/06 (2006.01) E21B 49/00 (2006.01)

Patent

CA 2298252

The present invention presents a method that effectively restores the real- time advantage of annular pressure while drilling (APWD) measurements taken during certain drilling operations that require the mud circulation pumps to be turned off (a "pumps-off" condition). APWD data, such as pressure measurements, is obtained from instruments and related electronics within the BHA. APWD data can be measured, stored and even processed in the BHA during a pumps-off condition for subsequent processing or communication of a reduced amount of data to the driller at the surface.

LandOfFree

Say what you really think

Search LandOfFree.com for Canadian inventors and patents. Rate them and share your experience with other people.

Rating

A method for obtaining leak-off test and formation integrity... does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with A method for obtaining leak-off test and formation integrity..., we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and A method for obtaining leak-off test and formation integrity... will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFCA-PAI-O-1971093

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.