H - Electricity – 02 – J
Patent
H - Electricity
02
J
H02J 5/00 (2006.01)
Patent
CA 2469768
A control process for a power management system comprised of elements which include, but are not limited to, a utility grid, a switch unit, a main distribution panel, a D.C. to A.C. inverter, an energy storage facility (eg, a battery plant), a charging facility to store electrical energy in said energy storage facility, a control unit, a user interface unit, and a machine interface unit is defined. Control process states include, but are not limited to, a Normal state, a Charging state, a Scheduled Off Grid state, an Emergency Off Grid state, and an Emergency Shut Down state. Events which cause transitions in control process states arc described as scheduled events, manually induced events, system events, or external events. Scheduled events include but are not limited to pre-programmed times of day that cause transitions from Normal state to and from Charging state, and from Normal state to and from Scheduled Off Grid state.
Na
Parisien Brian R.
LandOfFree
A methodology for time-shifting electrical grid energy... does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with A methodology for time-shifting electrical grid energy..., we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and A methodology for time-shifting electrical grid energy... will most certainly appreciate the feedback.
Profile ID: LFCA-PAI-O-1963355