E - Fixed Constructions – 21 – B
Patent
E - Fixed Constructions
21
B
E21B 33/14 (2006.01) C04B 7/02 (2006.01) C04B 22/00 (2006.01) C04B 24/20 (2006.01) C04B 28/14 (2006.01) C09K 8/46 (2006.01)
Patent
CA 2047485
A cement method and composition for cementing a well penetrating subterranean formations and aqueous based drilling fluid containing at least one cement retarder characterized by a major proportion of the drilling fluid from the well as it was drilled; water; a lesser proportion of dry cementitious material; a minor amount of a dispersant that does not affect satisfactory set cement within an acceptable time interval; and an accelerator selected from the class consisting of acetic acid; the first 4 carbon esters thereof: acetamide; monoethanolamine; and diethanolamine. The first 4 carbon esters are the methyl; ethyl; propyl, both normal and isopropyl; and butyl ester, normal, isobutyl and tertiary butyl.
Bloys James B.
Bradshaw Roger D.
Wilson William N.
Atlantic Richfield Company
Osler Hoskin & Harcourt Llp
LandOfFree
Cementing oil and gas wells does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Cementing oil and gas wells, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Cementing oil and gas wells will most certainly appreciate the feedback.
Profile ID: LFCA-PAI-O-2023189