E - Fixed Constructions – 21 – B
Patent
E - Fixed Constructions
21
B
166/35
E21B 43/00 (2006.01) E21B 43/24 (2006.01) E21B 43/26 (2006.01)
Patent
CA 1240263
ABSTRACT Performing steam drive operations in critical manipulative steps can improve the recovery of viscous hydrocarbons from tar sand deposits. Steam is injected into an injection well at a rate that is less than the rate needed to fracture the formation, and fluids are simultaneously produced from a communicating production well. When steam breakthrough occurs at the production well, the production well is shut-in, and the injection rate is increased to a rate at least sufficient to fracture the formation. After the reservoir is sufficiently heated, injection ceases and production resumes. Once the production rate declines to a rate that is no longer efficient, the process can be repeated.
508076
Bombardieri Caurino C.
Rakach Alec
Borden Ladner Gervais Llp
Esso Resources Canada Limited
LandOfFree
Combined replacement drive process for oil recovery does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Combined replacement drive process for oil recovery, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Combined replacement drive process for oil recovery will most certainly appreciate the feedback.
Profile ID: LFCA-PAI-O-1304259