CA 2279047
A command and control system and method for multiple turbogenerators in a grid parallel system includes a master controller to start, sequence, coordinate power commands, and provide fault handling to each of the individual turbogenerators and the specific control modes. A bi-directional power meter, that measures the load consumption (or production when a turbogenerator system is installed) in a building or application, may also be utilized. This power meter can provide a reference or setpoint to the master controller for controlling the individual turbogenerators.
Système et méthode de commande et de régulation de plusieurs turbogénératrices dans un réseau parallèle, comprenant un régulateur principal pour démarrer, ordonner et coordonner les commandes de puissance, ainsi que pour prendre en charge les défaillances de chacune des turbogénératrices et des modes de contrôle particuliers. Un wattmètre bidirectionnel, qui mesure la consommation de charge (ou la production lorsqu'un système de turbogénératrice est installé) dans un bâtiment ou une application, peut également être utilisé. Ce wattmètre peut servir de référence ou de valeur seuil au régulateur principal pour la régulation de chacune des turbogénératrices.
Capstone Turbine Corporation
Piasetzki Nenniger Kvas Llp
LandOfFree
Command and control system and method for multiple... does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Command and control system and method for multiple..., we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Command and control system and method for multiple... will most certainly appreciate the feedback.
Profile ID: LFCA-PAI-O-1894447