E - Fixed Constructions – 21 – D
Patent
E - Fixed Constructions
21
D
E21D 9/00 (2006.01) E02D 3/12 (2006.01) E02D 29/05 (2006.01) E21B 7/04 (2006.01) E21D 21/00 (2006.01)
Patent
CA 2456303
Continuous method of realization of underground tunnels, including the steps of making a plurality of guided perforations of small cross-section around a periphery of an underground tunnel to be realized and extending at least a majority of length of the underground tunnel to be realized, by perforation equipment with a movable perforation head, filling each guided perforation through at least one of reinforcements and aggregating materials to consolidate the tunnel with a resistant arrangement according to precise static conditions, and excavating the tunnel within said filled perforations.
Ferrari de Nobili S.r.l.
Marks & Clerk
LandOfFree
Continuous method of realisation of works underground,... does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Continuous method of realisation of works underground,..., we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Continuous method of realisation of works underground,... will most certainly appreciate the feedback.
Profile ID: LFCA-PAI-O-1531145