E - Fixed Constructions – 21 – B
Patent
E - Fixed Constructions
21
B
166/39
E21B 47/00 (2006.01) E21B 43/24 (2006.01) E21B 43/26 (2006.01) E21B 43/30 (2006.01)
Patent
CA 1246998
Abstract Of The Disclosure An enhanced oil recovery technique includes the prede- termination of a desired steam distribution within a steam flood pattern, which preferably is proportional to the vol- umes of oil in place within various sectors of an area of a subsurface formation. These sectors are associated with the various producing wells of the steam flood pattern. Initial steam distribution is then determined. Subsequently, one or more of the producing wells has its production rate modified so that the final steam distribution within the formation will more closely approximate the predetermined preferred steam distribution. A preferred technique for stimulating production from a given producing well includes the steps of initially notching and initiating a small unpropped fracture in the formation adjacent the well, then perforating the well over the entire depth of the formation, and sub- sequently creating a larger propped fracture at that same location after it has been determined that natural steam flow toward the particular producing well is not as great as is desired.
507230
Dodson Christopher J.
Ghassemi Farhad
Moore J. Scott
Powers Maston L.
Conoco Inc.
Mccallum Brooks & Co.
LandOfFree
Controlling steam distribution does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Controlling steam distribution, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Controlling steam distribution will most certainly appreciate the feedback.
Profile ID: LFCA-PAI-O-1232260