Critical path analyzer with path context window

G - Physics – 06 – F

Patent

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

CPC

354/46, 324/58.2

IPC codes

G06F 17/50 (2006.01)

Type

Patent

Patent number

CA 1333299

Description

A screen display includes a path context window for displaying a signal path in its entirety apart from the schematic sheets on which the path portions appear. The window contains multiple display portions each graphically displaying a path portion appearing on a separate schematic sheet. The multiple display portions are arranged adjacent to each other to display the entire signal path as continuous. The screen display also includes a path list window and may include view sheet windows each showing a schematic sheet of a path portion in the path context window. A user selects a path from the path list window, which causes a path context window containing the selected path to appear. Selecting a path portion from the displayed signal path causes a view sheet window containing the corresponding schematic sheet to appear. The means for producing the various windows and other features of the screen display is also disclosed.

Application Number

602405

LandOfFree

Say what you really think

Search LandOfFree.com for Canadian inventors and patents. Rate them and share your experience with other people.

Rating

Critical path analyzer with path context window does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Critical path analyzer with path context window, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Critical path analyzer with path context window will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFCA-PAI-O-1194762

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.