E - Fixed Constructions – 21 – B
Patent
E - Fixed Constructions
21
B
166/2
E21B 49/00 (2006.01) E21B 43/26 (2006.01) E21B 47/06 (2006.01)
Patent
CA 1185170
ABSTRACT A method of determining the minimum in-situ stress of an underground formation penetrated by a well. The method includes injecting a fluid at a certain rate into the formation to produce fractures in the formation, backflowing the injected fluid from the well at a rate less than the injection rate, and measuring the well fluid pressure decrease during the backflow to establish the pressure at which the fractures close.
396411
Nolte Kenneth G.
Smith Michael B.
Gowling Lafleur Henderson Llp
Standard Oil Company
LandOfFree
Determination of fracture closure pressure does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Determination of fracture closure pressure, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Determination of fracture closure pressure will most certainly appreciate the feedback.
Profile ID: LFCA-PAI-O-1170646