Determination of well pumping system downtime

E - Fixed Constructions – 21 – B

Patent

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

E21B 43/12 (2006.01) E21B 47/00 (2006.01) E21B 49/00 (2006.01) F04B 49/06 (2006.01)

Patent

CA 2051845

In a liquid well pumping system which is provided with a downtime between pumpoff cycles, the method of determining the maximum downtime includes running a plurality of tests to determine the relationship between runtime and downtime and determining when the relationship becomes non-linear for at least two consecutive tests. The downtime is selected adjacent the last linear relationship between runtime and downtime for providing a downtime which allows adequate fluid buildup in the well, but not so long a period as to loose well production.

LandOfFree

Say what you really think

Search LandOfFree.com for Canadian inventors and patents. Rate them and share your experience with other people.

Rating

Determination of well pumping system downtime does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Determination of well pumping system downtime, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Determination of well pumping system downtime will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFCA-PAI-O-1666920

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.