Dynamic reservoir engineering

E - Fixed Constructions – 21 – B

Patent

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

E21B 49/00 (2006.01) E21B 49/08 (2006.01)

Patent

CA 2649439

An example method for performing reservoir engineering includes generating a geological model of a reservoir including a geological horizon, obtaining an offset relative to the geological horizon, and positioning a wellbore equipment item in a well completion design based on the offset. The method further includes calculating an absolute position of the wellbore equipment item in the well completion design based on the offset and a location of the geological horizon in the geological model and updating the geological model to generate an updated location of the geological horizon. The method further includes updating the absolute position of the wellbore equipment item in the well completion design based on the offset and the updated location of the geological horizon and simulating a simulation case including the geological model and the well completion design after updating the absolute position of the wellbore equipment item.

LandOfFree

Say what you really think

Search LandOfFree.com for Canadian inventors and patents. Rate them and share your experience with other people.

Rating

Dynamic reservoir engineering does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Dynamic reservoir engineering, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Dynamic reservoir engineering will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFCA-PAI-O-1802663

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.