E - Fixed Constructions – 21 – B
Patent
E - Fixed Constructions
21
B
E21B 33/13 (2006.01) E21B 33/14 (2006.01)
Patent
CA 2757242
A method for improving zonal isolation between formations along a borehole, comprises a) providing a pipe in the borehole, wherein at least a portion of the pipe lies between the formations, b) providing a body of cement in the annulus between the borehole wall and said pipe portion, c) allowing the body of cement to cure until it has reached at least 70 Bearden units consistency, and d) expanding said pipe portion so as to decrease the cross-sectional area of the annulus between the borehole wall and said pipe portion.
Un procédé d'amélioration d'isolation zonale entre des formations situées le long d'un trou de forage comprend les étapes consistant à a) mettre en place un tuyau dans le trou de forage, au moins une partie du tuyau se trouvant entre les formations, b) mettre en place un corps de ciment dans l'espace annulaire situé entre la paroi de trou de forage et ladite partie de tuyau, c) laisser le corps de ciment sécher jusqu'à ce qu'il atteigne une consistance d'au moins 70 en unités Bearden, et d) dilater ladite partie de tuyau de manière à diminuer la section transversale de l'espace annulaire situé entre la paroi de trou de forage et ladite partie de tuyau.
Algu Devendra R.
Heathman James Frank
Shell Internationale Research Maatschappij B.v.
Smart & Biggar
LandOfFree
Expansion against cement for zonal isolation does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Expansion against cement for zonal isolation, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Expansion against cement for zonal isolation will most certainly appreciate the feedback.
Profile ID: LFCA-PAI-O-1636791