E - Fixed Constructions – 21 – B
Patent
E - Fixed Constructions
21
B
E21B 43/18 (2006.01) E21B 43/12 (2006.01)
Patent
CA 2376701
Natural gas produced from a well by executing a multiple-phase gas recovery cycle which includes a phase during which a relatively lower evacuation pressure is applied within the entire well bore to assist in accumulating liquids at a well bottom. The relatively lower evacuation pressure augments the national earth formation pressure to produce natural gas and liquid more rapidly. The phases of the gas recovery cycle are also coordinated with the phase in which the relatively lower evacuation pressure is applied throughout the well to facilitate a greater natural gas production rate.
Credo Petroleum Corporation
Moffat & Co.
Reitz Donald D.
LandOfFree
Gas recovery apparatus, method and cycle having a three... does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Gas recovery apparatus, method and cycle having a three..., we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Gas recovery apparatus, method and cycle having a three... will most certainly appreciate the feedback.
Profile ID: LFCA-PAI-O-1374067