E - Fixed Constructions – 21 – B
Patent
E - Fixed Constructions
21
B
E21B 43/00 (2006.01) E21B 47/00 (2006.01) E21B 49/00 (2006.01)
Patent
CA 2741791
Methods and systems are provided for allocating production among reservoir compartments by way of compositional and isotopic analyses. That is, where individual reservoir compartments contribute differing amounts of fluid to a commingled production stream, the methods herein determine the relative contribution of fluid volume from each reservoir compartment. Both a composition-based relative contribution and an isotope-based relative contribution of fluid from each reservoir compartment may be determined to allocate production to each reservoir compartment, the determinations respectively being based on composition mass balances and stable carbon isotope mass balances of components. The combination of both allocation analyses provides quality checks on the results that identify improper allocations that may arise. In addition to production allocation, other applications include, among others, determining the effectiveness of intervention operations and providing feedback for adjusting operations. Advantages include lower costs, higher accuracies, and ease of use as compared to conventional methods.
Jokanola Olufemi Akande
Michael Gerald Eric
Conocophillips Company
Oyen Wiggs Green & Mutala Llp
LandOfFree
Hydrocarbon production allocation methods and systems does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Hydrocarbon production allocation methods and systems, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Hydrocarbon production allocation methods and systems will most certainly appreciate the feedback.
Profile ID: LFCA-PAI-O-1530800