E - Fixed Constructions – 21 – B
Patent
E - Fixed Constructions
21
B
E21B 43/24 (2006.01)
Patent
CA 2721991
Methods and apparatus relate to systems and methods of recovering oil from a formation. In operation, a steam chamber develops as a result of steam injection into the formation and the recovery of fluids including the oil through a production well. An auxiliary well spaced in a lateral direction from the production well helps ensure development of the steam chamber as desired. The auxiliary well may enable heating of the formation through establishing an electric potential between the auxiliary well and the production well or by resistive heating of material forming the auxiliary well. Further, the auxiliary well may provide a flow path for solvent or gas injection to facilitate the recovery through the production well.
Dong Shuxing
Dreher Wayne Reid Jr.
Wheeler Thomas J.
Conocophillips Company
Oyen Wiggs Green & Mutala Llp
LandOfFree
In situ heating for reservoir chamber development does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with In situ heating for reservoir chamber development, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and In situ heating for reservoir chamber development will most certainly appreciate the feedback.
Profile ID: LFCA-PAI-O-1988864