E - Fixed Constructions – 04 – G
Patent
E - Fixed Constructions
04
G
E04G 21/00 (2006.01) B66F 3/46 (2006.01) B66F 7/28 (2006.01) B66F 11/00 (2006.01) F22B 37/24 (2006.01)
Patent
CA 2529655
An interference with existing structures is prevented at a time of a lifting construction of a boiler module. When the boiler module is lifted from the ground by lifting jacks provided on a steel frame main-beam and made an install construction to the main-beam, lifting jacks enabled to move laterally on the main-beam are disposed at forward and backward thereof to suspend the boiler module. The suspended module is lifted up to the main-beam and installed while changing a suspending position between an interference preventing position with existing modules and a prescribed suspending position by alternately moving the forward and backward lifting jacks laterally.
Hayashi Yuuichi
Kawaguchi Shigeyoshi
Nakamitsu Kazuhito
Hitachi Plant Engineering & Construction Co. Ltd.
Hitachi Plant Technologies Ltd.
Robic
LandOfFree
Lifting construction method and raising/lowering equipment... does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Lifting construction method and raising/lowering equipment..., we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Lifting construction method and raising/lowering equipment... will most certainly appreciate the feedback.
Profile ID: LFCA-PAI-O-1782847