E - Fixed Constructions – 21 – B
Patent
E - Fixed Constructions
21
B
166/21
E21B 43/26 (2006.01)
Patent
CA 1161358
ABSTRACT During fracture treatment of a subterranean for- mation, multiple hydraulic fracturing cycles are performed wherein the bottomhole treating pressure of a wellbore is controlled to not exceed a maximum bottomhole treating pressure for the formation, thereby attaining maximum principle fracture extension and limiting initiation of secondary fractures transverse to the principle fracture extension.
378568
Gowling Lafleur Henderson Llp
Standard Oil Company
LandOfFree
Maximizing fracture extension in massive hydraulic fracturing does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Maximizing fracture extension in massive hydraulic fracturing, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Maximizing fracture extension in massive hydraulic fracturing will most certainly appreciate the feedback.
Profile ID: LFCA-PAI-O-973783