E - Fixed Constructions – 21 – B
Patent
E - Fixed Constructions
21
B
E21B 33/14 (2006.01) C09K 8/42 (2006.01)
Patent
CA 2144846
A well completion process for improved cement placement in a horizontal wellbore (10) where a fluid is circulated down the wellbore (10) for conditioning and cleaning it. Afterwards, a production tube (12) containing centralizers (14) is positioned centrally within the wellbore (10). Next, a "spacer fluid" is circulated within an annulus (18) formed by the space between the tube (12) and the wellbore (10) so as to clean the annulus (18) out. Subsequently, a cement having a density greater than the spac- er fluid is pumped into the annulus (18). Thereafter, a light weight cement is pumped into the annulus (18) thereby overriding the heavier cement and removing voids in the annulus (18) resulting in more efficient cement placement.
Gowling Lafleur Henderson Llp
Mobil Oil Corporation
LandOfFree
Means for improving cement placement in horizontal wells does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Means for improving cement placement in horizontal wells, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Means for improving cement placement in horizontal wells will most certainly appreciate the feedback.
Profile ID: LFCA-PAI-O-1687771