E - Fixed Constructions – 21 – B
Patent
E - Fixed Constructions
21
B
E21B 21/08 (2006.01) E21B 44/00 (2006.01)
Patent
CA 2512437
A method and apparatus for predicting and controlling secondary kicks, while dealing with a primary kick experienced when drilling an oil and gas well. The method includes a step of determining whether a different pressure per cubic meter of mud pit volume has been caused by a secondary kick by subtracting shut in drill pipe pressure (SIDPP) from shut in casing pressure (SICP) and dividing the derived sum by a kick volume in KPa per cubic meter from the primary kick. A further step is then taken of increasing casing pressure until casing pressure equals pit gain times (X) rate of change in casing pressure per cubic meter of pit gain plus (+) SIDPP.
Shah Javed
Woodruff Nathan V.
LandOfFree
Method and apparatus for predicting and controlling... does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Method and apparatus for predicting and controlling..., we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Method and apparatus for predicting and controlling... will most certainly appreciate the feedback.
Profile ID: LFCA-PAI-O-1587690