E - Fixed Constructions – 21 – C
Patent
E - Fixed Constructions
21
C
E21C 41/00 (2006.01) E21B 7/04 (2006.01) E21C 41/28 (2006.01) E21F 7/00 (2006.01)
Patent
CA 2589332
A system for surface production of gas from a subterranean zone, includes a first well bore extending from the surface into the earth and a second well bore extending from the surface into the earth. The first and second well bores are coupled to each other at a junction in the earth. The system also includes a plurality of lateral well bores coupled to the junction and operable to conduct fluids from a subterranean zone to the junction. Gas may be produced from the subterranean zone to the surface through the first well bore.
Cdx Gas Llc
Kirby Eades Gale Baker
LandOfFree
Method and system for accessing subterranean deposits from... does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Method and system for accessing subterranean deposits from..., we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Method and system for accessing subterranean deposits from... will most certainly appreciate the feedback.
Profile ID: LFCA-PAI-O-1822859