E - Fixed Constructions – 21 – B
Patent
E - Fixed Constructions
21
B
E21B 43/24 (2006.01)
Patent
CA 2514776
Methods for forming a portion of a wellbore are provided. The well is drilled from a first selected depth to a second selected depth to form a bore through a surrounding earth formation. A fluid heating apparatus is disposed within the bore on a working string. Fluid is then heated by moving the fluid through the fluid heating apparatus in the wellbore. The process of circulating fluid adjacent the earth formation serves to also heat the surrounding formation so as to increase the fracture gradient. The fluid heating process may be conducted during a drilling procedure. Alternatively, the fluid heating process may be conducted in connection with a liner hanging and cementing process. A fluid flow restrictor is provided along a run-in assembly that serves to warm the fluids as they are circulated. The warm fluids provide convective heat to the surrounding earth formation, thereby reducing the formation's fracture gradient.
Bansal R.k.
Brunnert David J.
Gharesi Abdolreza
Grayson Michael Brian
Hanberry Tim
Deeth Williams Wall Llp
Weatherford/lamb Inc.
LandOfFree
Method for completing a well using increased fluid temperature does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Method for completing a well using increased fluid temperature, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Method for completing a well using increased fluid temperature will most certainly appreciate the feedback.
Profile ID: LFCA-PAI-O-1755798