E - Fixed Constructions – 21 – B
Patent
E - Fixed Constructions
21
B
E21B 43/26 (2006.01)
Patent
CA 2697210
A method and apparatus for processing a subterranean formation comprising stimulating and fracturing a subterranean formation, and drilling the subterranean formation wherein the drilling and fracturing occurs without removing equipment for drilling from the formation. A method and apparatus for drilling and fracturing a subterranean formation, comprising a drill string assembly and a hydraulic fracturing system, wherein the drill string and fracturing system are in communication with a wellbore and wherein the drill string and a fracture formed by the hydraulic fracturing system are less than about 1000 feet apart. A method and apparatus for processing a subterranean formation comprising fracturing a subterranean formation using a hydraulic fracturing system and drilling the subterranean formation using a drill string assembly wherein the drilling and fracturing occurs without removing the drill string from the formation, and wherein the fracturing occurs via ports in the drill string assembly.
Auzerais Francois M.
Boney Curtis L.
Boyd Austin
Dessinges Marie Noelle
Drochon Bruno
Schlumberger Canada Limited
Smart & Biggar
LandOfFree
Method for completing tight oil and gas reservoirs does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Method for completing tight oil and gas reservoirs, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Method for completing tight oil and gas reservoirs will most certainly appreciate the feedback.
Profile ID: LFCA-PAI-O-1646935