E - Fixed Constructions – 21 – B
Patent
E - Fixed Constructions
21
B
166/25
E21B 43/27 (2006.01) C09K 8/62 (2006.01) C09K 8/72 (2006.01) E21B 43/26 (2006.01)
Patent
CA 1112153
ABSTRACT METHOD FOR INCREASING THE PRODUCTIVITY OF A WELL PENETRATING AN UNDERGROUND FORMATION A low-viscosity acid is injected into a fracture containing a high-viscosity fluid. The injection takes place through perforations in the casing or production tubing, and the acid follows fingering flow paths in the fracture. The perforations are widely spaced (at least 60 centimetres distance between the perforations) to prevent merging of these flow paths close to the well.
324862
Avison Peter B.
Haafkens Rudolf
Schols Reinier S.
Van Der Vlis Abraham C.
Shell Canada Limited
Smart & Biggar
LandOfFree
Method for increasing the productivity of a well penetrating... does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Method for increasing the productivity of a well penetrating..., we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Method for increasing the productivity of a well penetrating... will most certainly appreciate the feedback.
Profile ID: LFCA-PAI-O-476165