Method for managing the production of a well

E - Fixed Constructions – 21 – B

Patent

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

E21B 43/26 (2006.01) E21B 33/138 (2006.01)

Patent

CA 2449195

The current invention provides a method for isolating selected downhole zones of a wellbore. The method utilizes pre-perforated conduit wherein the perforations have been temporarily sealed prior to positioning downhole. A resin-coated particulate, which forms a permeable solid mass to filter and prevent the introduction of formation sand or fines during well production and is used to secure the pre-perforated casing in the wellbore. The pre- perforated casing, permeable solid and formation are perforated and the resulting perforations filled with a curable composition which cures as an impermeable solid. The impermeable areas define individual downhole zones. Devices such as straddle packers or expandable tubes encapsulated in impermeable sleeves are used to isolate the resulting zones.

LandOfFree

Say what you really think

Search LandOfFree.com for Canadian inventors and patents. Rate them and share your experience with other people.

Rating

Method for managing the production of a well does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Method for managing the production of a well, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Method for managing the production of a well will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFCA-PAI-O-1431972

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.