Method for replacing old sleepers of a railway track by new...

E - Fixed Constructions – 01 – B

Patent

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

E01B 29/06 (2006.01)

Patent

CA 2570586

The aim of the invention is to replace old ties (6) of a railway track (8) by new ties (11). This aim can be achieved by spreading the two rails (7) apart from each other. The reception of ballast gravel (26) for producing a recess of ballast is carried out in a region below of the sleeper head (25) of a ballast bed (33), which is located adjacent to the region of the old sleepers (6) along their longitudinal axis. The received ballast gravel is temporarily stored and, once the new sleepers (11) have been deposited, thrown off for the purpose of ballasting. In parallel and prior to the deposit of new sleepers (11), excess ballast gravel (26) is ploughed in the recess of ballast so as to produce a levelled surface of ballast (27).

L'objectif de l'invention est de déplacer d'anciennes traverses (6) d'une voie de chemin de fer (8) par de nouvelles traverses (11). A cet effet, les deux rails (7) sont écartés l'un de l'autre. La réception de ballasts (26) destinés à produire une cavité pour un lit est réalisée dans une partie tête avant (26) des traverses d'un lit de ballasts placé sur les anciennes traverses (6) dans le sens de la longueur des traverses. Le ballast est ensuite stocké, puis il est retiré en fonction de la mise en place des nouvelles traverses (11) en vue d'un ballastage. Avant la mise en place des nouvelles traverses (11), des ballasts en surplus (26) sont labourés dans la cavité du lit, de manière à produire un palier de voies (27) de ballasts.

LandOfFree

Say what you really think

Search LandOfFree.com for Canadian inventors and patents. Rate them and share your experience with other people.

Rating

Method for replacing old sleepers of a railway track by new... does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Method for replacing old sleepers of a railway track by new..., we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Method for replacing old sleepers of a railway track by new... will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFCA-PAI-O-2018137

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.