Method of building a boiler frame

F - Mech Eng,Light,Heat,Weapons – 22 – B

Patent

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

F22B 37/24 (2006.01)

Patent

CA 2576315

New and useful method of building a boiler frame that significantly reduces the use of high load-lifting height crane and improves the operation efficiency despite of bad weather is disclosed. Multiple levels of steel supporting posts 20 that are established beforehand are linked together with their top portion by beams; and the 9th floor unit F9 is fixed to the posts at an intermediate floor position temporarily. Then suspension rods 42 suspended from lifting jacks 38 are connected to the 8th floor unit F8 and jack it up, while floor units made for lower than the 8th floor are connected on the ground to form a multi-floor unit. After connecting the multi-floor unit to the 9th floor unit F9, the temporally fixation is released, the multi-floor unit is lifted up, and each floor unit is permanently fixed to the designated floor position repeatedly and respectively.

LandOfFree

Say what you really think

Search LandOfFree.com for Canadian inventors and patents. Rate them and share your experience with other people.

Rating

Method of building a boiler frame does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Method of building a boiler frame, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Method of building a boiler frame will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFCA-PAI-O-1822862

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.