E - Fixed Constructions – 21 – B
Patent
E - Fixed Constructions
21
B
166/39
E21B 43/24 (2006.01)
Patent
CA 2039920
F-5726; METHOD OF PREHEATING A HEAVY OIL ZONE THROUGH EXISTING BOTTOM WATER AND THEM DIVERTING STEAM INTO THE OIL ZONE ABSTRACT A method for recovering viscous oil from a formation having a bottom water zone below an oil containing zone. Steam is directed into the bottom water zone thereby heating this zone and an oil containing zone thereabove. Afterwards, steam injection is ceased and a gellable composition is directed into the bottom water zone where it forms a solid gel. Once the solid gel has formed, steam is injected into the bottom water zone where the solid gel causes it to flow upwardly into the oil containing zone. Oil, water, and steam are removed via a recompleted producer well.
Sanchez James Michael
Strom Edwin Thomas
Gowling Lafleur Henderson Llp
Mobil Oil Corporation
LandOfFree
Method of preheating a heavy oil zone through existing... does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Method of preheating a heavy oil zone through existing..., we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Method of preheating a heavy oil zone through existing... will most certainly appreciate the feedback.
Profile ID: LFCA-PAI-O-1875803