E - Fixed Constructions – 21 – B
Patent
E - Fixed Constructions
21
B
E21B 44/00 (2006.01) E21B 47/00 (2006.01)
Patent
CA 2577031
A method of optimizing drilling including identifying design parameters for a drilling tool assembly, preserving the design parameters as experience data, and training at least one artificial neural network using the experience data. The method also includes collecting real-time data from the drilling operation, analyzing the real-time data with a real-time drilling optimization system, and determining optimal drilling parameters based on the analyzing the real-time date with the real-time drilling optimization system. Also, a method for optimizing drilling in real-time including collecting real-time data from a drilling operation and comparing the real-time data against predicted data in a real-time optimization system, wherein the real-time optimization includes at least one artificial neural network. The method further includes determining optimal drilling parameters based on the comparing the real-time data with the predicted data in the real-time drilling optimization system.
Huang Sujian J.
Moran David P.
Oliver Stuart R.
Paez Luis C.
Yan Lei
Borden Ladner Gervais Llp
Smith International Inc.
LandOfFree
Method of real-time drilling simulation does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Method of real-time drilling simulation, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Method of real-time drilling simulation will most certainly appreciate the feedback.
Profile ID: LFCA-PAI-O-1621215