E - Fixed Constructions – 21 – B
Patent
E - Fixed Constructions
21
B
166/39
E21B 43/24 (2006.01) E21B 43/16 (2006.01)
Patent
CA 2031814
Production of viscous hydrocarbons is initiated by first injecting an injection fluid down at least two tubing strings in a wellbore having multiple tubing strings therein. Following an initiation phase, flow of injection fluid in the production tubing string is ceased, and production of formation fluid to the surface commenced in the heated tubing. The production of formation fluids is controlled, and entry of uncondensed steam from the forma- tion into the wellbore avoided by maintaining a liquid level in the formation which is above the production perforations.
Anderson Donald J.
Duerksen John H.
Mccallum Doug J.
Petrick Mark
Chevron Research And Technology Company
Sim & Mcburney
LandOfFree
Method of recovering hydrocarbons using single well... does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Method of recovering hydrocarbons using single well..., we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Method of recovering hydrocarbons using single well... will most certainly appreciate the feedback.
Profile ID: LFCA-PAI-O-1632051