E - Fixed Constructions – 21 – B
Patent
E - Fixed Constructions
21
B
31/32
E21B 21/00 (2006.01) C09K 8/524 (2006.01)
Patent
CA 2007324
METHOD OF TREATMENT OF DRILLED-IN UNDERGROUND FORMATION SATURATED WITH HYDROCARBON GAS ABSTRACT The pressure consists in that the formation press- ure is measured, and a solvent is fed through a well into the formation. Then a hydrophilizing solution is fed through the same well into the same formation. The supply of the solvent and hydrophilizing solution is effected while keeping the bottom hole pressure appro- ximately equal to the formation pressure.
Abdullaev Teimur I.
Bakhishev Vagif J.
Berman Lev B.
Berman Svetlana S.
Abdullaev Teimur I.
Bakhishev Vagif J.
Berman Lev B.
Berman Svetlana S.
Marks & Clerk
LandOfFree
Method of treatment of drilled-in underground formation... does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Method of treatment of drilled-in underground formation..., we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Method of treatment of drilled-in underground formation... will most certainly appreciate the feedback.
Profile ID: LFCA-PAI-O-1579620