E - Fixed Constructions – 21 – B
Patent
E - Fixed Constructions
21
B
E21B 47/06 (2006.01) E02D 3/12 (2006.01) E21B 33/14 (2006.01) E21B 47/026 (2006.01) E21B 47/12 (2006.01) E21B 49/08 (2006.01) E21B 49/00 (2006.01) G01L 19/08 (2006.01)
Patent
CA 2552291
A method for preventing soil fracture and/or monitoring borehole pressure during jet grouting that may include monitoring borehole pressure at one or more points in a jet grouting borehole while the jet grouting is being performed and determining whether the borehole pressure exceeds a predetermined limit. The method may further include providing notification to a jet grouting operator that there is a high risk of soil fracture if the borehole pressure exceeds the predetermined limit. The predetermined limit may be the estimated fracture pressure of the soil in which the jet grouting is being performed.
Finlayson & Singlehurst
Kauschinger Joseph
LandOfFree
Methods and systems for monitoring pressure during jet grouting does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Methods and systems for monitoring pressure during jet grouting, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Methods and systems for monitoring pressure during jet grouting will most certainly appreciate the feedback.
Profile ID: LFCA-PAI-O-1807684