E - Fixed Constructions – 21 – B
Patent
E - Fixed Constructions
21
B
E21B 43/10 (2006.01) C04B 14/26 (2006.01) C04B 26/10 (2006.01) C04B 28/02 (2006.01) C04B 41/53 (2006.01) C09K 8/42 (2006.01) C09K 8/50 (2006.01) C09K 8/56 (2006.01) E21B 43/08 (2006.01)
Patent
CA 2416680
Methods of forming permeable sand screens in long, open hole well bores within fluid producing zones are provided by the present invention. The methods basically comprise the steps of placing a perforated pipe in the open hole well bore, providing a hardenable composition which after being placed in a desired location cures into a hard mass, placing said hardenable composition in said well bore adjacent to said fluid producing zone within the interior of the perforated pipe therein, between the perforated pipe and the walls of the open hole well bore and within voids or fractures in the producing zone, causing the hardenable composition to cure into a hard permeable mass and drilling the hard permeable mass out of the interior of the perforated pipe.
Dusterhoft Ronald G.
Nguyen Philip D.
Restarick Henry L.
Halliburton Energy Services Inc.
Norton Rose Or S.e.n.c.r.l. S.r.l./llp
LandOfFree
Methods of forming permeable sand screens in well bores does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Methods of forming permeable sand screens in well bores, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Methods of forming permeable sand screens in well bores will most certainly appreciate the feedback.
Profile ID: LFCA-PAI-O-1824025