E - Fixed Constructions – 21 – B
Patent
E - Fixed Constructions
21
B
E21B 43/26 (2006.01)
Patent
CA 2711080
Methods of fracturing a well can include the steps of: (A) obtaining a fracturing job design having at least one treatment interval; (B) running a tubular string into the treatment interval; (C) before or after the step of running, forming one or more tubular string openings in the tubular string, wherein after the step of running, the one or more tubular string openings are positioned in the treatment interval; (D) except for the axial passageway of the tubular string, blocking at least 86% of the nominal cross-sectional area of the treatment interval that is between one of the ends of the treatment interval and the axially closest of the one or more tubular string openings, and, except for the axial passageway of the tubular string, leaving unblocked at least 4% of the nominal cross-sectional area of the treatment interval; and (E) pumping a fracturing fluid through the one or more tubular string openings at a rate and pressure sufficient to initiate at least one fracture in the subterranean formation surrounding the treatment interval.
Hunt Herbert
Lewis Ray
Petro-Hunt Llc
Riches Mckenzie & Herbert Llp
LandOfFree
Methods of fracturing a well using venturi section does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Methods of fracturing a well using venturi section, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Methods of fracturing a well using venturi section will most certainly appreciate the feedback.
Profile ID: LFCA-PAI-O-1687846