E - Fixed Constructions – 21 – B
Patent
E - Fixed Constructions
21
B
E21B 43/26 (2006.01) E21B 43/17 (2006.01) E21B 43/30 (2006.01)
Patent
CA 2271531
Methods of stimulating and producing multiple stratified hydrocarbon reservoirs having numerous separate reservoir compartments are provided. The methods basically comprise the steps of drilling a first well bore into a lower part of the reservoir having a horizontal portion which intersects a previously drilled second well bore therein. At least one fracture is formed extending into two or more reservoir compartments from the horizontal portion of the third well bore for conducted hydrocarbons in the reservoir into the horizontal portion of the first well bore from where the hydrocarbons flow into the second well bore and are withdrawn.
Brown Raymond L.
Graham Stephen A.
Stegemeier David S.
Halliburton Energy Services Inc.
Ogilvy Renault Llp/s.e.n.c.r.l.,s.r.l.
LandOfFree
Methods of stimulating and producing multiple stratified... does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Methods of stimulating and producing multiple stratified..., we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Methods of stimulating and producing multiple stratified... will most certainly appreciate the feedback.
Profile ID: LFCA-PAI-O-1884498