Multi-zone fracturing completion

E - Fixed Constructions – 21 – B

Patent

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

E21B 23/06 (2006.01) E21B 33/10 (2006.01)

Patent

CA 2730695

A ported housing that may be connected along a casing string and the method for use of the ported housing in fracturing and/or treating multiple zones in a well. A sleeve is connected to the ported housing and may be moved between an initial position that prevents fluid flow through the ports of the housing and second position that permits fluid flow through the ports. A bottom hole assembly may be connected to the sleeve by an anchor. A packer element may create a seal between the bottom hole assembly and the sleeve permitting a pressure differential across the packer element to move bottom hole assembly down the casing moving the sleeve to the second position. In the second position, the formation adjacent to the ported housing may be stimulated and/or treated.

LandOfFree

Say what you really think

Search LandOfFree.com for Canadian inventors and patents. Rate them and share your experience with other people.

Rating

Multi-zone fracturing completion does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Multi-zone fracturing completion, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Multi-zone fracturing completion will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFCA-PAI-O-1849682

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.