Oil well production system

E - Fixed Constructions – 21 – B

Patent

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

E21B 33/035 (2006.01) E21B 23/03 (2006.01) E21B 36/00 (2006.01) E21B 43/12 (2006.01) E21B 43/40 (2006.01)

Patent

CA 2073415

-21- ICR 8289 & 90/004 Abstract Of The Disclosure A production system for a subsea well includes a concentric gas lift string and a production tubing string both located within a production riser. Lift gas injected down the annulus between the production tubing string and gas tubing string is injected into the production tubing string below the mud line and thus provides gas lift assistance to the produced fluid stream. Thus increased produced fluid flow is provided while simultaneously insulating the produced fluid from the surrounding ocean thus maintaining the temperature of the produced fluid which aids separator efficiencies once the produced fluid reaches a surface platform associated therewith. The use of the concentric gas tubing string avoids pressurizing of the production riser. A gas lift mandrel and associated apparatus are provided at the subsurface tubing hanger to permit gas to be selectively directed down to a lower gas lift valve located deeper within the well.

LandOfFree

Say what you really think

Search LandOfFree.com for Canadian inventors and patents. Rate them and share your experience with other people.

Rating

Oil well production system does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Oil well production system, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Oil well production system will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFCA-PAI-O-1656623

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.