Pipeline conditioning process for mined oil-sand

B - Operations – Transporting – 03 – B

Patent

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

196/17

B03B 9/02 (2006.01) B65G 53/30 (2006.01)

Patent

CA 2029795

As-mined, naturally water-wet oil sand is mixed at the mine site with hot water, air and NaOH to produce a slurry. The slurry is pumped through a pipeline at least about 2.5 kilometres in length and is fed directly to a conventional gravity separation vessel. In the course of being pumped through the pipeline, sufficient coalescence and aeration of bitumen occurs so that, when subsequently retained in the vessel under quiescent conditions, a desirable amount of the bitumen floats, forms froth, and is recovered.

LandOfFree

Say what you really think

Search LandOfFree.com for Canadian inventors and patents. Rate them and share your experience with other people.

Rating

Pipeline conditioning process for mined oil-sand does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Pipeline conditioning process for mined oil-sand, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Pipeline conditioning process for mined oil-sand will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFCA-PAI-O-2053988

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.