H - Electricity – 01 – H
Patent
H - Electricity
01
H
H01H 7/00 (2006.01) H01H 31/02 (2006.01) H01H 47/00 (2006.01) H01H 50/86 (2006.01)
Patent
CA 2293877
A power controller has upstream and downstream switches in series connection to provide redundant switching for power supplied from a power source to a load. A switch operating system closes the switch closer to the load first (downstream) and then the switch closer to the source (upstream). The operating system conditions closing the downstream switch on absence of power voltage on an upstream power terminal of the downstream switch. A preferred embodiment of the operating system performs a number of real time status checks during the connection process to assure that power voltage is properly absent and present at switch terminals during the stages of the connection process. This operating system guards against supplying power to the load if either the upstream or downstream switch's pair of contacts are welded at the time the connection process starts.
Bartels James I.
Juntunen Robert D.
Patton Paul B.
Solosky Richard M.
Honeywell Inc.
Smart & Biggar
LandOfFree
Power switching system does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Power switching system, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Power switching system will most certainly appreciate the feedback.
Profile ID: LFCA-PAI-O-2075314