E - Fixed Constructions – 21 – B
Patent
E - Fixed Constructions
21
B
E21B 43/12 (2006.01) E21B 17/18 (2006.01) E21B 47/12 (2006.01) F16L 9/00 (2006.01)
Patent
CA 2105722
Method and production pipe for production of oil or gas from a well in an oil and/or gas reservoir, or injection of fluids into a well in an oil and/or gas reservoir, comprising a production pipe (1) with a lower drainage pipe (2). The drainage pipe (2) is divided into sections (3) with one or more inflow-restriction devices (4) which control the flow of oil or gas from the reservoir into the drainage pipe on the basis of calculated loss of friction pressure along the drainage pipe, the reservoir's calculated productivity profile, and the calculated inflow of gas or water.
Brekke Kristian
Sargeant Jon Petter
Fetherstonhaugh & Co.
Norsk Hydro A.s.
LandOfFree
Procedure and production pipe for production of oil or gas... does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Procedure and production pipe for production of oil or gas..., we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Procedure and production pipe for production of oil or gas... will most certainly appreciate the feedback.
Profile ID: LFCA-PAI-O-2027196