E - Fixed Constructions – 02 – D
Patent
E - Fixed Constructions
02
D
166/1, 61/32
E02D 3/00 (2006.01) E02D 3/10 (2006.01) E02D 5/00 (2006.01)
Patent
CA 1245547
ABSTRACT A procedure for draining off shallow gas from the seabed and arrangement for execution of the procedure, involves inserting through the upper sedimentary layer a system of vertical drainage piles for gas around the site in question, e.g. for location of a construction on the seabed or along a pipeline route on the seabed. The arrangement includes essentially a base plate with a central hole for receiving a drainage pile after the base plate has been placed on the seabed.
462216
Gudmestad Ove T.
Hovland Martin T.
Den Norske Stats Oljeslskap A.s.
Fetherstonhaugh & Co.
LandOfFree
Procedure for draining off shallow gas from the seabed and... does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Procedure for draining off shallow gas from the seabed and..., we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Procedure for draining off shallow gas from the seabed and... will most certainly appreciate the feedback.
Profile ID: LFCA-PAI-O-1189940