E - Fixed Constructions – 21 – B
Patent
E - Fixed Constructions
21
B
E21B 43/26 (2006.01) C09K 8/68 (2006.01) C09K 8/80 (2006.01) E21B 37/06 (2006.01)
Patent
CA 2686508
A process and process line is provided for preparing a friction-reduced hydraulic fracturing fluid at a central location which can be readily transported to an oil or gas well in a formation at a well site, comprising: preparing a mixture of polymer and water at the central location by shearing the polymer in the water in a high shear environment to create the friction-reduced hydraulic fracturing fluid; pumping the friction- reduced hydraulic fracturing fluid through a series of pumps and pipelines to the well site; and injecting the hydraulic fracturing fluid into the oil or gas well at a pressure sufficient to cause fracturing of the formation.
Defosse Grant Todd
Mccorriston Lois Louise
Bennett Jones Llp
Encana Corporation
LandOfFree
Process and process line for the preparation of hydraulic... does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Process and process line for the preparation of hydraulic..., we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Process and process line for the preparation of hydraulic... will most certainly appreciate the feedback.
Profile ID: LFCA-PAI-O-2071559