E - Fixed Constructions – 21 – B
Patent
E - Fixed Constructions
21
B
E21B 43/26 (2006.01) E21B 23/03 (2006.01)
Patent
CA 2268597
A wellbore (10) in an earth formation (12) having a casing (14) and a plurality of pay or production zones (32, 34, 36) provided in the formation. A coiled tubing string (18) from a reel (20) is injected by an injector (24) into the wellbore (10) for first perforating casing section (38) at each pay zone (32, 34, 36) in a single pass of the coiled tubing (18). Next, the coiled tubing (18) is utilized for hydraulic fracturing each of the pay zones (32, 34, 36) individually from the lowermost pay zone (32) to the uppermost pay zone (36) in a single pass of the coiled tubing (18). Each pay zone (32, 34, 36) is isolated for the hydraulic fracturing. An upper packer (44 or 54) is provided above each of the pay zones for isolation and a lower packer (56) or sand plug (50) is utilized for isolating the lower or outermost end of each pay zone (32, 34, 36). Swab cups (58, 54A, 56A, 54B, 56B) are also utilized for isolation of pay zones.
Lemp Stephen P.
Thiessen Robert D.
Zemlak Warren
Dowell Schlumberger Canada Inc.
Smart & Biggar
LandOfFree
Process for hydraulically fracturing oil and gas wells... does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Process for hydraulically fracturing oil and gas wells..., we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Process for hydraulically fracturing oil and gas wells... will most certainly appreciate the feedback.
Profile ID: LFCA-PAI-O-1481826