Process for manufacturing forge-welding steel pipe

G - Physics – 05 – D

Patent

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

341/15.1

G05D 23/19 (2006.01) B21C 37/083 (2006.01) B23K 28/00 (2006.01) C21D 9/56 (2006.01)

Patent

CA 1085023

Abstract of the Disclosure In a butt-welded steel pipe manufacturing equipment, an edge portion temperature and a center portion temperature of a steel strip are detected at a location between the outlet of a heating furnace and the inlet of a butt- welding mill. The heating condition of the steel strip in the heating furnace is controlled in accordance with the difference between the edge portion temperature and a target edge portion temperature, and the transporting speed of the steel strip is controlled in accordance with the difference between the edge portion temperature and the center portion temperature and with the difference between the target edge portion temperature and a target center portion temperature.

292757

LandOfFree

Say what you really think

Search LandOfFree.com for Canadian inventors and patents. Rate them and share your experience with other people.

Rating

Process for manufacturing forge-welding steel pipe does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Process for manufacturing forge-welding steel pipe, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Process for manufacturing forge-welding steel pipe will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFCA-PAI-O-167654

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.