E - Fixed Constructions – 21 – B
Patent
E - Fixed Constructions
21
B
31/26
E21B 43/26 (2006.01) C09K 8/514 (2006.01)
Patent
CA 1079946
A B S T R A C T In well treatments such as workovers, fracturing processes, etc., permeable subterranean earth formations are temporarily plugged by contacting them with self thickening-and-thinning liquid systems. The systems initially contain unhydrated cellu- lose ether dispersed in aqueous liquid solutions of buffering agents, pH-increasing reactants and pH-decreasing reactants. The system components are arranged 80 that the cellulose ether hydration is first delayed by a buffer-maintained acidity, then is accelerated by an increasing pH, whereafter the high viscosity due to the dissolved hydrated cellulose ether is reduced by an acid-induced hydrolysis of the ether.
280238
Knapp Randolph H.
Richardson Edwin A.
Na
Shell Canada Limited
LandOfFree
Process for temporarily plugging a permeable subterranean... does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Process for temporarily plugging a permeable subterranean..., we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Process for temporarily plugging a permeable subterranean... will most certainly appreciate the feedback.
Profile ID: LFCA-PAI-O-611854