Process for temporarily plugging a permeable subterranean...

E - Fixed Constructions – 21 – B

Patent

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

31/26

E21B 43/26 (2006.01) C09K 8/514 (2006.01)

Patent

CA 1079946

A B S T R A C T In well treatments such as workovers, fracturing processes, etc., permeable subterranean earth formations are temporarily plugged by contacting them with self thickening-and-thinning liquid systems. The systems initially contain unhydrated cellu- lose ether dispersed in aqueous liquid solutions of buffering agents, pH-increasing reactants and pH-decreasing reactants. The system components are arranged 80 that the cellulose ether hydration is first delayed by a buffer-maintained acidity, then is accelerated by an increasing pH, whereafter the high viscosity due to the dissolved hydrated cellulose ether is reduced by an acid-induced hydrolysis of the ether.

280238

LandOfFree

Say what you really think

Search LandOfFree.com for Canadian inventors and patents. Rate them and share your experience with other people.

Rating

Process for temporarily plugging a permeable subterranean... does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Process for temporarily plugging a permeable subterranean..., we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Process for temporarily plugging a permeable subterranean... will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFCA-PAI-O-611854

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.