Process for transferring goods load units on or from a train...

B - Operations – Transporting – 65 – G

Patent

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

B65G 63/00 (2006.01) B61K 1/00 (2006.01) B65G 63/02 (2006.01)

Patent

CA 2142350

ABSTRACT For the transloading of loaded goods units (82), such as containers, interchangeable containers, semi-trailers or the like by means of transloading lifting gear (18) from or onto a slowly travelling train (6) formed by containerwagons (48), there is initially associated with each container wagon (48) to be unloaded and/or loaded a reference point (R) the position of which, is continuously measured in relation to a fixed measuring section (40). Subsequently there is measured, in relation to the fixed measuring section (40) - in the case of a unit (82) to be unloaded, the position, of at least one load attack point (81), and - in the case of a unit (82) to be loaded, the position of locating elements (93) of the container wagon (48). The common centre point (85) of the load attack points (81) respectively of the locating elements (93) in relation to thereference point (R) is computed, the position of the centre (86) of the load receiving points of the associated transloading lifting gear (18) is continuously measured in relation to the fixed measuring section (40, 41) and the transloading lifting gear is moved so that its load receiving centre (86) coincides with the centre (85) of the load attack points (81) respectively the locating elements (93).

LandOfFree

Say what you really think

Search LandOfFree.com for Canadian inventors and patents. Rate them and share your experience with other people.

Rating

Process for transferring goods load units on or from a train... does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Process for transferring goods load units on or from a train..., we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Process for transferring goods load units on or from a train... will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFCA-PAI-O-1411990

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.